​​Location: Hilton Brussels Grand Place, Carrefour de l’Europe 3, 1000 Brussels Date: 9 March 2016, 10:30 -17:00 CET Final agenda: here & all material presented: here

This workshop is associated with the connection codes (RfG, DCC and HVDC) implementation. It aims at guiding the national implementation processes of each implementing country on choosing the appropriate ranges and values for requirements of each connection code related to frequency stability. In this event ENTSO-E members’ experts on system planning and operation, with a strong knowledge of system stability aspects, presented the specific characteristics and challenges for each synchronous area. This was followed the by expert discussions on frequency parameters on two main groups: synchronous and non-synchronous generators.

Outcomes of the workshop: