On 10 August ENTSO-E released its system needs study, showing where new solutions for electricity exchange are needed to reach climate neutrality while keeping security and costs under control. Beyond the next wave of anticipated cross-border grid investment (35GW by 2025), needs have been identified everywhere in Europe, with a total of 50GW of needs on close to 40 borders in 2030 and 43 additional GW on more than 55 borders in 2040.

Join our webinar on 28 September at 10.00 to learn more about future system needs.

Date: 28 September, 10.00 to 12.00

Agenda: to be uploaded shortly

Link to the system needs page