Capacity Calculation Regions

Sep 30, 2020
Capacity Calculation Regions assessment report

Apr 1, 2019
Following the amendment submitted in May 2018 by the TSOs, on 2 October 2018, all regulatory authorities have sent a letter to ACER, requesting to adopt a decision on this ‘second proposal for amendment’. In February 2019 ACER adopted a decision on the second proposal for amendment in March 2019.

Sep 18, 2017
All NRAs agreement to approve the all TSOs’ proposal for an amendment to include the upcoming BE-GB interconnector in the decision on capacity calculation regions

Jul 21, 2017
All TSOs’ deliver the amendment request to include the upcoming BE-GB interconnector in the decision on capacity calculation regions

Apr 7, 2017
All TSOs’ launch consultation on an amendment include the upcoming BE-GB interconnector in the decision on capacity calculation regions

Nov 17, 2016
ACER decision on the determination of capacity calculation regions

Nov 17, 2015
All TSOs’ proposal for the determination of capacity calculation regions is delivered


Baltic

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/09/2017
NRA approval deadline
18/03/2018
TSOs amendment deadline
16/05/2018
TSOs amendment final approval
21/05/2018
NRA approval deadline
21/07/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
20/01/2018
TSOs proposal deadline
17/03/2018
TSOs final submission
16/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA final approval
4/04/2018

FCA Deliverables

A 30.2 NRA decision on implementation of LTR - in...
Full Title
NRA decision on implementation of LTR - in case no LTRs exist at entry into force
Responsible
Cluster
Geographical Scope
A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA final approval
4/04/2018
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

No tasks in nc matrix.

SOGL Deliverables

A 76.1 Common provisions for regional operational security coordination
Full Title
Common provisions for regional operational security coordination
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Regional Coordination
Geographical Scope
TSOs proposal deadline
21/12/2019

Channel

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
23/06/2017
TSOs proposal deadline
17/09/2017
NRA approval deadline
1/03/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
1/12/2017
TSOs proposal deadline
17/03/2018
TSOs final submission
16/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs final submission
17/04/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

No tasks in nc matrix.

SOGL Deliverables

A 76.1 Common provisions for regional operational security coordination
Full Title
Common provisions for regional operational security coordination
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Regional Coordination
Geographical Scope
TSOs proposal deadline
21/12/2019

Core

CEP

DA & ID CCMs (Art 20ff)

Core CCR Program

Announcements (press-release, communication note etc.)

Core Consultative Group meetings

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA Escalation to ACER
20/07/2018
A 20ff Submit a proposal for the intraday common coordinated...
Full Title
Submit a proposal for the intraday common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...

FCA Deliverables

A 16.1 Develop a proposal for a methodology for splitting...
Full Title
Develop a proposal for a methodology for splitting long-term cross-zonal capacity
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

A 41.1 Proposal for a methodology for market-based CZC allocation...
Full Title
Proposal for a methodology for market-based CZC allocation (voluntary, each CCR to decide)
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Balancing Capacity & CZC Allocation
Geographical Scope
A 42.1 Proposal for a methodology for the allocation of...
Full Title
Proposal for a methodology for the allocation of cross-zonal capacity based on an economic efficiency analysis (voluntary, each CCR to decide)
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Balancing Capacity & CZC Allocation
Geographical Scope

SOGL Deliverables

A 76.1 Common provisions for regional operational security coordination
Full Title
Common provisions for regional operational security coordination
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Regional Coordination
Geographical Scope


Greece Italy (GRIT)

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
8/02/2018
TSOs proposal deadline
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

No tasks in nc matrix.

SOGL Deliverables

No tasks in nc matrix.

Hansa

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
20/12/2017
TSOs proposal deadline
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA amendment final approval
14/12/2017
A 74.1 Develop proposal for Redispatching and counter trading cost...
Full Title
Develop proposal for Redispatching and counter trading cost sharing methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

FCA Deliverables

A 10.1 Submit proposal for a common capacity calculation methodology...
Full Title
Submit proposal for a common capacity calculation methodology for long-term time frames
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 16.1 Develop a proposal for a methodology for splitting...
Full Title
Develop a proposal for a methodology for splitting long-term cross-zonal capacity
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 21.2 Develop operational rules for long-term capacity calculation time...
Full Title
Develop operational rules for long-term capacity calculation time frames supplementing the rules defined for the operation of the coordinated capacity calculators
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 30.2 NRA decision on implementation of LTR - in...
Full Title
NRA decision on implementation of LTR - in case no LTRs exist at entry into force
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

A 41.1 Proposal for a methodology for market-based CZC allocation...
Full Title
Proposal for a methodology for market-based CZC allocation (voluntary, each CCR to decide)
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Balancing Capacity & CZC Allocation
Geographical Scope
A 42.1 Proposal for a methodology for the allocation of...
Full Title
Proposal for a methodology for the allocation of cross-zonal capacity based on an economic efficiency analysis (voluntary, each CCR to decide)
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Balancing Capacity & CZC Allocation
Geographical Scope

SOGL Deliverables

A 76.1 Common provisions for regional operational security coordination
Full Title
Common provisions for regional operational security coordination
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Regional Coordination
Geographical Scope

Italy North

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/09/2017
TSOs final submission
12/06/2018
NRA approval deadline
12/12/2018
TSOs amendment deadline
11/08/2019
A 21.1 Submit a proposal for a common D-2 capacity...
Full Title
Submit a proposal for a common D-2 capacity methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 21.1. Submit a for an intraday common methodology capacity...
Full Title
Submit a for an intraday common methodology capacity calculation
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs final submission
7/02/2017
NRA amendment final approval
11/01/2018

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

A 41.1 Proposal for a methodology for market-based CZC allocation...
Full Title
Proposal for a methodology for market-based CZC allocation (voluntary, each CCR to decide)
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Balancing Capacity & CZC Allocation
Geographical Scope
A 42.1 Proposal for a methodology for the allocation of...
Full Title
Proposal for a methodology for the allocation of cross-zonal capacity based on an economic efficiency analysis (voluntary, each CCR to decide)
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Balancing Capacity & CZC Allocation
Geographical Scope

SOGL Deliverables

A 76.1 Common provisions for regional operational security coordination
Full Title
Common provisions for regional operational security coordination
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Regional Coordination
Geographical Scope
TSOs proposal deadline
21/12/2019

Ireland and United Kingdom (IU)

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/09/2017
TSOs final submission
1/09/2017
NRA approval deadline
1/03/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
12/01/2018
TSOs proposal deadline
17/03/2018
TSOs final submission
16/03/2018
NRA 2nd amendment request
14/01/2019
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA amendment final approval
14/06/2017

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA final approval
13/10/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

No tasks in nc matrix.

SOGL Deliverables

A 76.1 Common provisions for regional operational security coordination
Full Title
Common provisions for regional operational security coordination
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Regional Coordination
Geographical Scope
TSOs proposal deadline
21/12/2019

Nordic

Other

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
1/04/2017
TSOs proposal deadline
17/09/2017
TSOs final submission
15/09/2017
NRA approval deadline
15/03/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
2/01/2018
TSOs proposal deadline
17/03/2018
TSOs final submission
16/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA final approval
16/03/2018
NRA amendment final approval
16/03/2018

FCA Deliverables

A 16.1 Develop a proposal for a methodology for splitting...
Full Title
Develop a proposal for a methodology for splitting long-term cross-zonal capacity
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 30.2 NRA decision on implementation of LTR - in...
Full Title
NRA decision on implementation of LTR - in case no LTRs exist at entry into force
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

A 41.1 Proposal for a methodology for market-based CZC allocation...
Full Title
Proposal for a methodology for market-based CZC allocation (voluntary, each CCR to decide)
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Balancing Capacity & CZC Allocation
Geographical Scope
NRA Escalation to ACER
NRAs Statement of Disagreement
A 42.1 Proposal for a methodology for the allocation of...
Full Title
Proposal for a methodology for the allocation of cross-zonal capacity based on an economic efficiency analysis (voluntary, each CCR to decide)
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Balancing Capacity & CZC Allocation
Geographical Scope

SOGL Deliverables

A 76.1 Common provisions for regional operational security coordination
Full Title
Common provisions for regional operational security coordination
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Regional Coordination
Geographical Scope
TSOs proposal deadline
21/12/2019

South East Europe

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
13/11/2017
TSOs proposal deadline
17/09/2017
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
2/02/2018
TSOs proposal deadline
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

No tasks in nc matrix.

SOGL Deliverables

A 76.1 Common provisions for regional operational security coordination
Full Title
Common provisions for regional operational security coordination
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Regional Coordination
Geographical Scope
TSOs proposal deadline
21/12/2019

South West Europe

SWE CCM External Parallel Run

Older versions

SWE Publications

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs amendment deadline
14/05/2018
TSOs amendment final approval
9/05/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
24/01/2018
TSOs proposal deadline
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

FCA Deliverables

A 10.1 Submit proposal for a common capacity calculation methodology...
Full Title
Submit proposal for a common capacity calculation methodology for long-term time frames
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 16.1 Develop a proposal for a methodology for splitting...
Full Title
Develop a proposal for a methodology for splitting long-term cross-zonal capacity
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA final approval
17/10/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

EB Deliverables

No tasks in nc matrix.

SOGL Deliverables

A 76.1 Common provisions for regional operational security coordination
Full Title
Common provisions for regional operational security coordination
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Regional Coordination
Geographical Scope
TSOs proposal deadline
21/12/2019
GET THE MOST POWERFUL NEWSLETTER IN BRUSSELS